Hv / Lv Jointers

4 months ago


Halstead, United Kingdom RJ Power Full time

**Roles and Responsibilities : How the Expected Outcomes are Achieved**
- Deliver the installation of Joints (Straight, branch, trifurcation and transition) and Terminations on a wide range of electricity cables up to 11kv.
- Follow all published guidelines, standards, policies and procedures to ensure satisfactory completion of work
- Maintain and develop competence level and technical skills to ensure delivery to high standards
- Deliver all works to time and standard in accordance with instructions.
- Maintain awareness of the RJ Power Networks Health & Safety policies and rules and keep up to date on changes through engaging with Toolbox talks and other sources of information.
- Follow the RJ Power Networks Distribution Safety Rules at all times, also taking into account any client or site-specific considerations.
- Accurate and timely completion of all mandatory documentation including Job documentation, timesheets, vehicle checks and other compliance requirements.
- Always take responsibility for the Health and Safety of yourself and others
- Report any concerns regarding Safety, Health or the Environment to your line manager or the HSQE Manager
- Use all machinery, equipment, substances, transport and plant appropriately and in line with company guidance.

**Requirements for the Role**
- Holds at least a Level 2 NVQ in Electrical/ Mechanical Engineering
- Can demonstrate the ability to joint (straight, branch, trifurcation, transition,) and terminate the following cables/conductors; -Multicore LV AC/DC cables for small power and protection circuits.
- LV Multicore cable for power distribution circuits.
- LV PILC cable to XLPE LV cable joint.
- 3.3kV XLPE 1c and 3c cable.
- 11kV EPR double insulated cable circuits for generator circuits.
- 11kV screened cables for internal dry type transformer connections.
- 11kV Triplex cables.
- 11kV 1c XLPE AWA.
- 11kV 3c XLPE SWA.
- Has an appreciation of 11kV PICAS cable.
- 11kV PILC cable.
- Can use cold shrink joint kits on all variants of XLPE cables.
- Can use cold shrink termination kits on all variants of XLPE cables.
- Able to remove old bitumastic compound from electrical plant.
- Able to correctly set out gland plates
- Can demonstrate basic electrical plant knowledge e.g. Power system operation, transformers, switchgear, HV and LV cables, EPO buttons, generators.
- Can demonstrate a good knowledge of cable earthing systems and can installed copper tape and associated earthing components.
- Can demonstrate a detailed knowledge of cable installation procedures in accordance with DNO procedures.
- Can show a detailed knowledge of cable installation procedures in accordance with DNO procedures.
- Has an awareness of cable pulling tensions.
- Has a good knowledge of cable minimum bending radii.
- Has an appreciation of LV busbar trucking systems.
- Has the ability to perform cable conductor insulation resistance testing and sheath testing on 11kV cables.
- Has the ability to correctly phase cable systems.
- Can demonstrate strong and accurate report writing skills

**BENEFITS
- Enhanced benefits after successful probation**
- 25 days holiday plus bank holidays
- After 2 years continuous service, 1 extra days leaver per year up to a maximum of 5
- Long Service Awards
- Training and Development opportunities
- Pension Scheme
- Optical Eye Care Vouchers
- Death in Service
- Health Care
- Birthday Day Off